FY 2019 KEDDO FUNDED REAP PROJECTS |
SPONSER/COMMUNITY/CONTRACT |
PROJECT DESCRIPTION |
AMOUNT |
CHOCTAW COUNTY |
|
|
|
|
|
County/Willow Pool Road |
Rock/Asphalt and Oil Sand of 1 mile of Willow Pool Road. |
$38,326.36 |
County/Cut Bank Road |
Oil Sand Patching of 2 miles of Cut Bank Road. |
$38,326.36 |
County/ Red Road |
Asphalt Patching of 4.5 miles of Red Road. |
$38,326.36 |
|
|
|
HASKELL COUNTY |
|
|
County/ D4560 & N4560 Road |
Oil/Chip seal .5 mile of N4560/D4560 road from the intersection with Hwy 9 and N4560 road go north 2 miles to the beginning of project and continue northeast to the endpoint. |
$38,326.36 |
County/ E1170 Road |
Oil/Chip Seal of .5 mile of E1170 Road beginning at the intersection with N4470 road and go west. This project is located 5 miles east of Stigler, Ok on Hwy 9 and 4 miles north to the starting point. |
$38,326.36 |
County/ E1210 Road |
Oil/Chip Seal .5 mile of E1210 Road, from the intersection of E1210 road and N4312 road is the starting point and go east. |
$38,326.36 |
|
|
|
LATIMER COUNTY |
|
|
Town of Red Oak |
Purchase one new backhoe. |
$15,000.00 |
County/ Bengal Comm. Center |
Renovation to include floor replacement, chimney removal and roof repairs. |
$13,910.00 |
County/RWD#2 |
Purchase and installation of two new 6” inline water master meters. |
$16,419.09 |
County/Knight Road |
Oil/chip seal road renovation of a minimum of .5 mile of Knight Road beginning at the intersection with US 270 approximately two miles west of Wilburton, Ok city limits and continue north .5 mile. |
$23,216.67 |
County/ Buffalo Road |
Oil/chip seal road renovation of a minimum .5 mile of Buffalo Road beginning at a intersection with Hwy 63 approximately 2 miles east of Pittsburg/Latimer county line. |
$23,216.67 |
County/ Happy Hollow Road |
Oil/chip seal road renovation of a minimum of .5 mile of Happy Hollow Road. |
$23,216.66 |
|
|
|
LEFLORE COUNTY |
|
|
Town of Spiro |
Purchase and installation of (140) one hundred forty new automated water meters, (1) one handheld wand, (1) one laptop and software. |
$15,000.00 |
Town of Wister |
Purchase and installation of (4) four new fire hydrants. |
$13,315.44 |
County/ Tucker Comm. Center |
Purchase and installation of (1) new septic tank and 300’ of new lateral line and purchase and installation of (3) – 2.5 ton H/A units. |
$11,500.00 |
County/ Haw Creek VFD |
Purchase and installation of one new skid unit to include 400-gallon tank, foam system, electric hose reel and 100 feet of one-inch hose. |
$6,176.18 |
County/ Highline Road |
Oil/chip seal renovation of approximately one mile of Highline Road. |
$22,995.82 |
County/Horse Ranch Road |
Oil/chip seal renovation of approximately one mile of Horse Ranch Road. |
$22,995.82 |
County/Lovings Road |
Asphalt patching of approximately four miles of Lovings Road. |
$22,995.82 |
|
|
|
MCCURTAIN COUNTY |
|
|
City of Broken Bow |
Purchase and installation of (8) eight new Fire Hydrants. |
$15,000.00 |
County/ Holly Creek VFD |
Purchase (5) five new sets of bunker gear, including coats, pants, boots, hoods, helmets, gloves and bags. |
$12,700.00 |
County/Golden Comm. Center |
Renovation on the community center inside to include new paint on ceiling and walls, floor covering, new LED lights, new air ducts, kitchen and bathroom improvements. |
$18,291.62 |
County/Craig Road K |
Blade-in asphalt spot patching of approximately one mile of Craig Road, the project will begin one mile south of the intersection with US Highway 70, five miles west of Broken Bow and continuing south. |
$22,995.82 |
County/ Old B-Bow Hwy. Road |
Blade-in asphalt spot patching of approximately 1.5 miles of the Old Broken Bow Highway Road, beginning at the Little River Bridge on the Old Broken Bow Highway Road and run to the south for 1.5 miles. |
$45,991.64 |
|
|
|
PITTSBURG COUNTY |
|
|
County/Pitts.Co. Con, Dist |
Purchase of one new hay trailer for transporting round hay bales, 42 feet long and an 8-bale capacity. |
$5,999.00 |
County/ Haywood-Arpelar VFD |
Purchase of new coldwater rescue equipment to include, (1) one rapid deployment craft, (2) two dry suits, (4) four ice rescue suits and (4) four ice picks. |
$7,847.50 |
County/Seven Devils Road & Shannon Road |
Oil/chip seal road renovation of approximately 2.5 miles of Seven Devils Road. |
$101,132.58 |
|
|
|
PUSHMATAHA COUNTY |
|
|
City of Antlers |
Purchase of (1) one new complete Monitor/Defibrillator for the city owned ambulance to include (4) four batteries, (1) one mobile battery charger, (1) one 4 foot patient cable,(3) three reusable cuffs, (2) two reusable sensors and (3) three various type of carrying cases for this equipment. |
$31,903.10 |
County/Darwin VFD |
Purchase (1) one new gas-powered water pump (minimum 20 HP) with 100 feet of hose and nozzle for skid unit on quick attack fire unit. |
$4,970.00 |
County/ Red Hill Road |
Blade-in asphalt spot patching of approximately (3) three miles of Red Hill Road |
$78,105.98 |
|
|
|
CDBG-REAP |
|
|
Latimer County/High Bridge Road |
Asphalt road resurfacing of High Bridge Road, beginning 400 feet to the east of the intersection with Clonsilla Road which is approximately 3 miles north of US Highway 270 and 1 mile east of the Pittsburg/Latimer county line and continue east approximately 2.5 miles. |
$160,000.00 |